Property · 5 min read
New Build Handover Checklist: Snags and Defects
A new build handover checklist for NZ homes: the pre-handover walk-through, writing a snag and defects list, appliance manuals and code compliance in general.
PrestigePro team ·
https://prestigepro.co.nz/blog/new-build-handover-checklist-nz
Picking up the keys to a brand-new home is exciting, and the temptation is to sign whatever you are handed and start moving boxes. Slow down for one afternoon. The handover walk-through is the easiest time to get small faults fixed, because the builder is still on site, the trades are still nearby and everyone can see the problem together.
This checklist covers how to prepare for that walk-through, what to look for room by room, how to write up defects so they get fixed, and what paperwork to collect. For the rules around building contracts, consents and defect repair periods, building.govt.nz is the official source, and your contract sets out what your builder has agreed to.
Before the walk-through
Ask the builder for a date and time in daylight, and allow a couple of hours. Bring a notepad or phone, a torch, painter's tape or small sticky dots to mark faults, a phone charger to test power points, and your copy of the plans and specifications.
Read through the specifications the night before. Note the agreed finishes, tapware, benchtops, light fittings and appliances so you can confirm the right things were installed, not just that things were installed.
Inside, room by room
- Walls and ceilings: look along them with a torch held flat against the surface. It shows up bumps, poor stopping, nail pops and patchy paint.
- Doors: open and close every one, including wardrobes and the garage internal door. Check they latch without forcing and do not rub on the floor.
- Windows: open, close and lock each one, and check the seals and stays. Look for scratches on the glass.
- Floors: walk every room listening for squeaks and looking for lifted edges, gaps at skirting boards or chips in tiles.
- Kitchen: open every drawer and cupboard, check soft-close hinges, and look for gaps where the benchtop meets the wall.
- Bathrooms: run every tap and shower, check the water drains away freely, and inspect silicone joints for gaps or smears.
- Power and lights: switch on every light and test each socket with your charger. Check the extractor fans actually pull air.
- Heating and ventilation: run the heat pump on heat and cool, and check any ventilation system is switched on and working.
Outside and around the section
- Walk around the full exterior looking for damaged cladding, missing flashings, paint runs and gaps around windows and doors.
- Check downpipes connect to the stormwater system and do not just empty onto the ground.
- Look at how the ground falls. Water should run away from the house, not pool against it.
- Test the garage door, the letterbox key, outside taps and any exterior lights.
- Check fences, paths and driveways listed in your contract are complete and finished as agreed.
- Find the water toby, switchboard and any gas meter, and ask the builder to show you how to shut each off.
Writing a defects list that gets results
A clear list makes it easy for the builder to assign work to the right trade. For each item, write the room, the exact location, what is wrong and what you expect. "Main bedroom, left wardrobe door, catches on frame when closing" will get fixed faster than "wardrobe not right".
Take a photo of every item with something for scale, mark it with tape, and number the photos to match your list. Send the list in writing, keep a copy, and ask the builder to confirm in writing which items they accept and when they expect to fix them.
Separate genuine defects from changes of mind. A cracked tile is a defect; deciding you would rather have a different tile is a variation and usually a separate conversation.
Appliances, manuals and warranties
Ask for a folder, paper or digital, with everything you will need later. It should include:
- Manuals and warranty details for every appliance, the heat pump, the hot water system and the garage door.
- Care instructions for benchtops, flooring, cladding and joinery, including any maintenance needed to keep warranties valid.
- Paint colours and product names for each room, so touch-ups match.
- Contact details for the builder and the main subcontractors.
- Copies of any guarantees or warranty documents that came with your building contract.
- Keys for every lock, window, the letterbox and the garage, plus spare remotes.
Code compliance, in general terms
When building work needs a consent, the council inspects it during construction and, once satisfied, issues a code compliance certificate. Your builder normally applies for it near the end of the job. Ask where it is up to and when you can expect a copy, and check your contract and your lawyer's advice on how it fits with settlement or final payment.
building.govt.nz explains the consent and code compliance process, building contracts and what happens if defects appear after you move in. If you are unsure about anything at handover, ask before you sign, not after.
The first months in your new home
Some faults only show once you live in a house. Timber framing dries and settles, so small cracks in plaster at corners and above doors are common in the first year. Keep a running list, with dates and photos, and send it to your builder in batches rather than one item at a time.
Open windows regularly and run extractor fans, because new homes carry a lot of moisture from construction. Clean window tracks and check silicone around showers early, so small issues do not turn into water damage later.
PrestigePro renovations and building, and our handyman service, are both coming soon in Christchurch and Auckland and are not taking work yet. You can register interest on each service page. Our team is police vetted and we carry $5M public liability insurance. For any other question, use our contact page.